New building in progress for our new owners of lot 32-4
the owners of lot 32-4 are excited and ready to build on this beautiful lot. They have drawn up amazing house plans and are in the process of talking with competing contractors to get started. A roof top Ramada is going to be added to give them more entertainment space. a 5000 gal septic system will be installed using the new abs arches for the leach line. water lines to the lot are in and 1 inch meter installed. below are some elevations of their vision for the home away from home.
bricks and cement arrive, for the septic tank
Crews start the layout for the house foundation
memo using his backhoe to start the septic tank hole
Progress on the construction is going without flaws so far! below is update pictures on the progress of the lower floor. septic is completed! walls are up and beam structure is being prepared!!!
walls up, the floor braces are installed and waiting for the rebar
lots of rebar is used to make the upper floor very strong!!!
crews mixing cement and pouring the main floor of this house
what view from the main floor! paradise at its finest.
The stairs in the making!!!
Almost done! roof needs to be poured and 2 1/2 ft wall on roof with ramada still to go!!!
NEW DOORS HAVE BEEN INSTALLED IN THE LOWER UNIT, LOWER STEP ON STAIRS POURS, AND ARCHES OVER STAIRS INSTALLED. COLUMNS FOR THE TOP FLOOR RAMADA HAVE BEEN COMPLETED AND INTERIOR STUCCO NOW BEING APPLIED.
SUNRISE FROM THE SECOND FLOOR OF THIS HOME!